top

Cabinet installation

Foshan shunkangda Medical Technology Co., Ltd. supports EXW, FOB, CNF, CIF and other delivery methods. The delivery time is generally 35 to 50 days after receiving the deposit. We have a number of professional production lines and independent packaging, transportation and loading equipment to ensure that the products are delivered to customers intact.

wl6.jpg

Get the latest price? We'll respond as soon as possible(within 12 hours)
  • Required and valid email address
  • This field is required
  • This field is required
  • This field is required
  • This field is required